|
The E-ASAP container-launcher installed on the boat "SEALAND PERFORMANCE" since July 2003 |
|
| Objectives | |
| The objective of the EUMETNET-ASAP (E-ASAP) Programme is to satisfy EUCOS requirements and to improve the cost/efficiency by integrated management of the existing national systems. | |
| Requirements | |
|
|
| A. |
integrate gradually the existing national systems and procure new ones to reach a total of 18 in 2006 producing about 6300 soundings per year. |
| B. |
optimise the overall system and reduce the average cost of a sounding. |
| C. | integrate the sounding operations of OWS-Mike and Ekofisk. |
| D. | contribute to the World Weather Watch of WMO through a limited number of soundings produced outside the EUCOS area of interest. |
| Programme Tasks : | |
|
|
| Organisation | |
|
|
|
|